Design and manufacturing feasibility of ITER TBM Frame and Dummy TBMs
2016
Abstract The operation and test of mock-ups of tritium breeding blankets relevant for a future commercial reactor is one of the goals of the ITER machine. To accomplish this goal, mock-ups of breeding blankets, called Test Blanket Modules (TBMs), are installed in three ITER equatorial ports. Each TBM and the associated shield form a TBM-set that is mechanically attached to a steel frame called TBM Frame. A Frame and two TBM-Sets form a TBM Port Plug (TBM PP). The ITER Organization is responsible for the design and manufacture of the TBM Frames and of the Dummy TBMs that could replace the TBM-sets in case they were not available. This paper describes the recent results of the design supporti…
Three-Dimensional Neutronics and Shielding Analyses for the ITER Divertor
1996
3-D neutronics and shielding analyses have been performed for the divertor region of the ITER interim design. The peak neutron wall loading in the divertor region is 0.6 MW/m{sup 2} at the divertor cassette dome. The total nuclear heating in the 60 divertor cassettes is 102.4 MW. The peak helium production in the VV behind the pumping ducts is 0.5 He appm/FPY implying that rewelding might be feasible. The total nuclear heating in the parts of the TF coils in the divertor region is only 2.1 kW. 5 refs., 4 figs., 5 tabs.